Pricing
What blocks actually cost
Block prices move with three things: how many you order, which size, and how far the load has to travel. Rather than hide that behind a form, here is how we price — and what is and is not included.
How pricing works
Three things set the rate
01
Quantity
Rate per block falls as the order grows. A full truckload is priced differently to a part load.
02
Block size
A 4-inch block uses less material than an 8-inch. Price per block follows the section.
03
Distance to site
Freight is quoted from the yard to your pincode. Beyond our radius, the cost stops making sense and we will tell you so.
Included in the block rate
- Blocks to the published specification
- Loading at our yard
- GST at the applicable rate
Quoted separately
- Freight to site, quoted separately
- Unloading at your site
- Storage after delivery
- Minimum order
- —
- Payment terms
- —
- Typical lead time
- —
Rates are quoted per order because they depend on quantity and distance. Send your details below and we will come back with a firm number.
Request a quote
Tell us what you need
Size, quantity and pincode is enough to price it. Most quotes go out the same working day.
